The jetty at Stenhouse Bay was 164 metres long and the gypsum was stockpiled at the top of the cliff. Ore trucks on rails and cables transported the gypsum down the steep cliff. Later a cutting was made through the cliff which allowed the ore to be transported directly to the jetty.